Datacenter Sites in District of Columbia, District of Columbia
District of Columbia has 91 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 2,622 MW. FEMA rates local natural-hazard risk as "Very Low". The county has a datacenter tax incentive on record.
91
Candidate sites
54.1/100
Avg DC Readiness
2,622 MW
Catalogued capacity
theoretical aggregate
Very Low
Hazard rating
Site-selection context for District of Columbia
Yestax_credits
Datacenter tax incentive
13.52¢/kWh
Commercial electricity
1.89¢/kWh
Industrial electricity
15
Fiber providers
Low-Medium
Water stress
—
Land price / acre
1,500
Cooling degree days
4,200
Heating degree days
57°F
Mean annual temp
Incentive detail: Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.
By site type
Top datacenter sites in District of Columbia
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BUZZARD POINT | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 75.5 |
| TOKOMA | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.7 |
| BENNING (230KV) | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.5 |
| O ST | Substation-Adjacent | 138 kV | 100 MW | 3.1 yrs | 72.0 |
| ALABAMA AVENUE | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 71.7 |
| METZEROTT ROAD | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 71.5 |
| BLADENSBURG | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 71.4 |
| BENNING (69KV) | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 71.4 |
| PEPCO HARVARD | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 71.1 |
| TUXEDO | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 70.0 |
| VAN NESS | Substation-Adjacent | 138 kV | 100 MW | 3.1 yrs | 69.9 |
| BETHESDA | Substation-Adjacent | 138 kV | 100 MW | 3.1 yrs | 69.7 |
| UNKNOWN162145 | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 69.3 |
| UNKNOWN123341 | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 69.2 |
| WILDERCROFT | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 68.4 |
| TENTH ST | Substation-Adjacent | 138 kV | 100 MW | 3.1 yrs | 67.5 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.7 |
| EC Coal District of Columbia | Greenfield | — | — | 3.1 yrs | 66.6 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.5 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.4 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.3 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 65.8 |
| NIH Cogeneration Facility | Brownfield | — | 22 MW | 3.5 yrs | 63.8 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 63.7 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 61.8 |
District of Columbia datacenter FAQ
- How many datacenter sites are in District of Columbia?
- 91 scored datacenter candidate sites, averaging 54.1/100 DC Readiness.
- Does District of Columbia offer datacenter tax incentives?
- Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.
- What is the natural-hazard risk in District of Columbia?
- FEMA's National Risk Index rates District of Columbia as "Very Low" (score 12).
- What are industrial electricity rates in District of Columbia?
- Average industrial electricity is 1.89¢/kWh and commercial is 13.52¢/kWh in District of Columbia.
Dataset updated . Screening estimates derived from public data sources.