METZEROTT ROAD
Substation-AdjacentDistrict of Columbia, Maryland · PJM
METZEROTT ROAD is a substation-adjacent datacenter candidate site in District of Columbia, Maryland, interconnecting through PJM. It screens at 65.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in District of Columbia, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BUZZARD POINT | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 68.5 |
| BENNING (230KV) | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 68.4 |
| ALABAMA AVENUE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 67.4 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.5 |
| EC Coal District of Columbia | Greenfield | — | — | 3.1 yrs | 66.4 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.3 |
| TOKOMA | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 66.3 |
| OZ District of Columbia | Greenfield | — | — | 3.1 yrs | 66.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for METZEROTT ROAD, District of Columbia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.