Skip to content
Gridcensus

Norwood Landfill Community Solar

Brownfield

San Miguel County, Colorado · WECC

DC Readiness
53.3
Fair / 100

Norwood Landfill Community Solar is a brownfield datacenter candidate site in San Miguel County, Colorado, interconnecting through WECC. It screens at 53.3/100 DC Readiness with a catalogued 0 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN203905
Substation distance1.0 mi
Substation voltage115 kV
Available capacity0 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Fiber providers4
Fiber coverage39.9%
Nearest cloud providerGoogle
Nearest cloud regionus-west3
Cloud region distance264.4 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity0 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteVILLAGE CENTER CLEANERS
Hazard sub-score65/100
Construction cost index92.8 (avg 100)

Location context

Nearest rail4.1 mi
Nearest gas pipeline7.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.68¢/kWh
Industrial electricity13.77¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,179

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
37
Speed to power15%
43
Fiber connectivity12%
40
Energy cost10%
82
Water risk8%
47
Natural hazard8%
65
Buildability7%
75
Labor market4%
50
DC cluster4%
10
Land / acreage3%
76
Construction cost3%
73
Gas pipeline2%
77
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in San Miguel County, ranked by DC Readiness.

Sites near Norwood Landfill Community Solar
SiteTypeVoltageCapacityQueue waitScore
EC Coal San Miguel CountyGreenfield1.7 yrs53.7
OZ San MiguelGreenfield1.7 yrs50.2
UNKNOWN201518Substation-Adjacent115 kV100 MW6.9 yrs49.9
UNKNOWN205449Substation-Adjacent138 kV100 MW6.9 yrs49.1
UNKNOWN203905Substation-Adjacent115 kV100 MW6.9 yrs48.8
UNKNOWN205445Substation-Adjacent69 kV50 MW6.9 yrs46.8
LASEL TAPSubstation-Adjacent69 kV50 MW6.9 yrs46.5
DamonIndustrial6.9 yrs46.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.