Greenfield (STERLING - PEETZ)

Greenfield

Logan County, Colorado · WECC

DC Readiness
54.6
Fair / 100

Greenfield (STERLING - PEETZ) is a greenfield datacenter candidate site in Logan County, Colorado, interconnecting through WECC. It screens at 54.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSTERLING
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance84.4 mi
Fiber providers7
Fiber coverage36.4%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance382.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerScott Gene L & H Lorraine Irrevocable
Parcel APN38027328200052
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index74.3 (avg 100)

Location context

Nearest datacenterWindbreak Cable
DC distance53.0 mi
Nearest rail0.7 mi
Nearest gas pipeline4.2 mi
Nearest fiber route76.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.94¢/kWh
Industrial electricity11.03¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,141

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
33
Fiber connectivity12%
59
Energy cost10%
89
Water risk8%
51
Natural hazard8%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
88
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Logan County, ranked by DC Readiness.

Sites near Greenfield (STERLING - PEETZ)
SiteTypeVoltageCapacityQueue waitScore
SPRING CANYONSubstation-Adjacent230 kV300 MW1.7 yrs65.6
PEETZ TABLE WIND ENERGYSubstation-Adjacent230 kV300 MW1.7 yrs63.9
UNKNOWN201534Substation-Adjacent230 kV300 MW1.7 yrs63.2
UNKNOWN205871Substation-Adjacent115 kV100 MW1.7 yrs62.2
STERLINGSubstation-Adjacent138 kV100 MW1.7 yrs61.6
PEETZSubstation-Adjacent115 kV100 MW1.7 yrs60.6
TAP208155Substation-Adjacent138 kV100 MW1.7 yrs60.5
TAP205869Substation-Adjacent115 kV100 MW1.7 yrs60.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (STERLING - PEETZ), Logan County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.