Greenfield (DANIELS PARK - WATERTON)

Greenfield

Douglas County, Colorado · WECC

DC Readiness
52.1
Fair / 100

Greenfield (DANIELS PARK - WATERTON) is a greenfield datacenter candidate site in Douglas County, Colorado, interconnecting through WECC. It screens at 52.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDANIELS PARK
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPCentersquare Denver (DEN1)
IXP distance3.8 mi
Fiber providers11
Fiber coverage32.9%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance373.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerPublic Service Co Of Colo
Parcel APN222929400001
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Emergent Herbaceous Wetlands

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteHIGHLANDS RANCH COLLISION CENTER INC
Hazard sub-score30/100
Construction cost index113.6 (avg 100)

Location context

Nearest datacenterCentersquare Denver (DEN1)
DC distance3.8 mi
Nearest rail0.4 mi
Nearest gas pipeline2.8 mi
Nearest fiber route31.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.19¢/kWh
Industrial electricity8.52¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$12,290

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
33
Fiber connectivity12%
59
Energy cost10%
89
Water risk8%
59
Natural hazard8%
30
Buildability7%
0
Labor market4%
50
DC cluster4%
80
Land / acreage3%
50
Construction cost3%
55
Gas pipeline2%
91
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near Greenfield (DANIELS PARK - WATERTON)
SiteTypeVoltageCapacityQueue waitScore
DANIELS PARKSubstation-Adjacent345 kV600 MW1.7 yrs71.4
HOMESTEADSubstation-Adjacent230 kV300 MW1.7 yrs69.7
MARCYSubstation-Adjacent230 kV300 MW1.7 yrs69.2
SURREY RIDGESubstation-Adjacent230 kV300 MW1.7 yrs69.1
LEMON GULCHSubstation-Adjacent230 kV300 MW1.7 yrs69.0
SULPHURSubstation-Adjacent230 kV300 MW1.7 yrs67.4
SANTA FESubstation-Adjacent230 kV300 MW1.7 yrs64.8
UNKNOWN202100Substation-Adjacent115 kV100 MW1.7 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (DANIELS PARK - WATERTON), Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.