SCHNITZER STEEL

Substation-Adjacent

Contra Costa, California · CAISO

DC Readiness
60.3
Good / 100

SCHNITZER STEEL is a substation-adjacent datacenter candidate site in Contra Costa, California, interconnecting through CAISO. It screens at 60.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSCHNITZER STEEL
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneCAISO_NP15
Wholesale LMP$16.53/MWh
Utility commercial rate0.30¢/kWh

Speed to power

ISO / RTO regionCAISO
Queue depth311
Avg queue wait5.7 yrs
Recent queue wait3.0 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPDigital Realty OAK (720 2nd St)
IXP distance0.3 mi
Fiber providers7
Fiber coverage42.6%
Nearest cloud providerAzure
Nearest cloud regionwestus
Cloud region distance7.1 mi

Site characteristics

Parcel ownerPACIFIC GAS & ELECTRIC COMPANY
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former useoil
Existing capacity75 MW
Retirement date2021-01-01

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteNOR CAL METAL FABRICATORS
Hazard sub-score42/100
Construction cost index127.7 (avg 100)

Location context

Nearest datacenterDigital Realty OAK (720 2nd St)
DC distance0.3 mi
Nearest rail0.0 mi
Nearest gas pipeline3.3 mi
Nearest fiber route160.2 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.96¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$9,199

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
44
Fiber connectivity12%
87
Energy cost10%
52
Water risk8%
53
Natural hazard8%
42
Buildability7%
100
Labor market4%
50
DC cluster4%
100
Land / acreage3%
55
Construction cost3%
44
Gas pipeline2%
89
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Contra Costa, ranked by DC Readiness.

Sites near SCHNITZER STEEL
SiteTypeVoltageCapacityQueue waitScore
ROSSMOORSubstation-Adjacent230 kV300 MW5.7 yrs62.7
EMBARCADEROSubstation-Adjacent230 kV300 MW5.7 yrs62.4
San Francisco Electric Reliability ProjBrownfield152 MW61.9
TIDEWATERSubstation-Adjacent230 kV300 MW5.7 yrs61.4
BAHIASubstation-Adjacent230 kV300 MW5.7 yrs60.4
LONE TREESubstation-Adjacent230 kV300 MW5.7 yrs60.3
TASSAJARASubstation-Adjacent230 kV300 MW5.7 yrs59.3
ROSSMOOR TAP 2Substation-Adjacent230 kV300 MW5.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SCHNITZER STEEL, Contra Costa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.