TAP137905

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
138
kV

TAP137905 is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates42.7982, -87.8630

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32606138 kVAMERICAN TRANSMISSION COIN SERVICE10.3 mi
#44410138 kVAMERICAN TRANSMISSION COIN SERVICE0.0 mi
#45879138 kVAMERICAN TRANSMISSION COIN SERVICE2.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP137905, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP137905 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121936Substation-AdjacentWIKenosha County345 kV600 MW1.4 yrs79.1
PLEASANT PRAIRIESubstation-AdjacentWIKenosha County345 kV600 MW1.4 yrs76.9
RACINESubstation-AdjacentWIRacine County345 kV600 MW1.4 yrs75.7
OAK CREEK STATIONSubstation-AdjacentWIMilwaukee County345 kV600 MW1.4 yrs75.0
ZIONSubstation-AdjacentWIMilwaukee County345 kV600 MW1.4 yrs74.4
BLUEMOUNDSubstation-AdjacentWIMilwaukee County230 kV300 MW1.4 yrs73.6
BAINSubstation-AdjacentWIKenosha County345 kV600 MW1.4 yrs72.8
O CONNORSubstation-AdjacentWIMilwaukee County138 kV100 MW1.4 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP137905 substation, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.