SUNRISE
SubstationWisconsin · AMERICAN TRANSMISSION CO
SUNRISE is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #17685 | 138 kV | AMERICAN TRANSMISSION CO | IN SERVICE | 2.7 mi |
| #26814 | 138 kV | AMERICAN TRANSMISSION CO | IN SERVICE | 11.8 mi |
| #30813 | 138 kV | AMERICAN TRANSMISSION CO | IN SERVICE | 9.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SUNRISE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CHRISTIANA | Substation-Adjacent | WI | Jefferson County | 345 kV | 600 MW | 1.4 yrs | 73.7 |
| KITTYHAWK | Substation-Adjacent | WI | Rock County | 345 kV | 600 MW | 1.4 yrs | 72.9 |
| TAP136941 | Substation-Adjacent | IL | Winnebago County | 345 kV | 600 MW | 2.2 yrs | 71.6 |
| PADDOCK | Substation-Adjacent | WI | Rock County | 345 kV | 600 MW | 1.4 yrs | 71.5 |
| UNKNOWN124165 | Substation-Adjacent | IL | Winnebago County | 345 kV | 600 MW | 2.2 yrs | 71.4 |
| RISER163001 | Substation-Adjacent | WI | Dane County | 138 kV | 100 MW | 1.4 yrs | 71.3 |
| UNIVERSITY (WE) | Substation-Adjacent | WI | Walworth County | 138 kV | 100 MW | 1.4 yrs | 70.5 |
| TAP136942 | Substation-Adjacent | IL | Winnebago County | 345 kV | 600 MW | 2.2 yrs | 70.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SUNRISE substation, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.