SHERIDAN (ALTE)

Substation

Wisconsin

Max voltage
138
kV

SHERIDAN (ALTE) is an electric transmission substation in Wisconsin. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates44.4006, -89.1838

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#35594138 kVIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SHERIDAN (ALTE), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SHERIDAN (ALTE) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WHITCOMBSubstation-AdjacentWIShawano County345 kV600 MW1.4 yrs71.2
ARNOTTSubstation-AdjacentWIPortage County138 kV100 MW1.4 yrs70.2
CAROLINESubstation-AdjacentWIShawano County345 kV600 MW1.4 yrs69.2
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIPortage County345 kV600 MW1.4 yrs68.8
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIPortage County345 kV600 MW1.4 yrs68.4
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIPortage County345 kV600 MW1.4 yrs67.8
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIWaupaca County345 kV600 MW1.4 yrs67.7
WAUTOMASubstation-AdjacentWIWaushara County138 kV100 MW1.4 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SHERIDAN (ALTE) substation, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.