PADDOCK

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
345
kV

PADDOCK is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates42.5098, -89.0962

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#38828345 kVAMERICAN TRANSMISSION COIN SERVICE15.1 mi
#57843345 kVAMERICAN TRANSMISSION COIN SERVICE7.2 mi
#4143138 kVAMERICAN TRANSMISSION COIN SERVICE7.0 mi
#22438138 kVAMERICAN TRANSMISSION COIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PADDOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PADDOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHERRY VALLEYSubstation-AdjacentILBoone County345 kV600 MW2.2 yrs74.9
TAP137908Substation-AdjacentILBoone County345 kV600 MW2.2 yrs73.4
KITTYHAWKSubstation-AdjacentWIRock County345 kV600 MW1.4 yrs72.9
TAP137909Substation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.9
WEMPLETOWNSubstation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.7
TAP137873Substation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.6
TAP136941Substation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.6
PADDOCKSubstation-AdjacentWIRock County345 kV600 MW1.4 yrs71.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PADDOCK substation, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.