HARRISON NORTH 138KV

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
138
kV

HARRISON NORTH 138KV is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates44.3697, -89.1374

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11344138 kVAMERICAN TRANSMISSION COIN SERVICE2.8 mi
#30928138 kVAMERICAN TRANSMISSION COIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HARRISON NORTH 138KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HARRISON NORTH 138KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WHITCOMBSubstation-AdjacentWIShawano County345 kV600 MW1.4 yrs71.2
ARNOTTSubstation-AdjacentWIPortage County138 kV100 MW1.4 yrs70.2
CAROLINESubstation-AdjacentWIShawano County345 kV600 MW1.4 yrs69.2
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIPortage County345 kV600 MW1.4 yrs68.8
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIPortage County345 kV600 MW1.4 yrs67.8
WAUTOMASubstation-AdjacentWIWaushara County138 kV100 MW1.4 yrs67.7
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIWaupaca County345 kV600 MW1.4 yrs67.7
Greenfield (WERNER WEST - ROCKY RUN)GreenfieldWIWaupaca County345 kV600 MW1.4 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.