EDGEWATER STATION

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
345
kV

EDGEWATER STATION is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates43.7151, -87.7079

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1252345 kVAMERICAN TRANSMISSION COIN SERVICE33.5 mi
#21254345 kVAMERICAN TRANSMISSION COIN SERVICE40.3 mi
#4237138 kVAMERICAN TRANSMISSION COIN SERVICE6.8 mi
#19802138 kVIN SERVICE6.8 mi
#64230138 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EDGEWATER STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EDGEWATER STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EDGEWATER STATIONSubstation-AdjacentWISheboygan County345 kV600 MW1.4 yrs76.1
SHEBOYGAN FALLS STATIONSubstation-AdjacentWIOzaukee County345 kV600 MW1.4 yrs73.5
TAP138061Substation-AdjacentWIOzaukee County345 kV600 MW1.4 yrs72.6
CEDARSAUKSubstation-AdjacentWIOzaukee County345 kV600 MW1.4 yrs69.7
TAP138062Substation-AdjacentWIWashington County345 kV600 MW1.4 yrs69.1
Greenfield (TAP138061 - GRANVILLE)GreenfieldWIWashington County345 kV600 MW1.4 yrs68.6
Greenfield (TAP138061 - SHEBOYGAN FALLS ST)GreenfieldWIWashington County345 kV600 MW1.4 yrs67.3
MEYER RDSubstation-AdjacentWICalumet County138 kV100 MW1.4 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EDGEWATER STATION substation, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.