ANTIGO

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
115
kV

ANTIGO is an electric transmission substation in Wisconsin, operated by AMERICAN TRANSMISSION CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates45.1525, -89.2297

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10882115 kVAMERICAN TRANSMISSION COIN SERVICE5.9 mi
#10910115 kVAMERICAN TRANSMISSION COIN SERVICE2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ANTIGO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ANTIGO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WHITCOMBSubstation-AdjacentWIMarathon County115 kV100 MW1.4 yrs69.2
PINE (WPS)Substation-AdjacentWILincoln County115 kV100 MW1.4 yrs67.5
BUNKER HILLSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs65.2
BLACKBROOK SW STASubstation-AdjacentWILanglade County115 kV100 MW1.4 yrs64.5
ANTIGOSubstation-AdjacentWILanglade County115 kV100 MW1.4 yrs64.3
AURORA STSubstation-AdjacentWILanglade County115 kV100 MW1.4 yrs64.3
Greenfield (WHITCOMB - CAROLINE)GreenfieldWIShawano County345 kV600 MW1.4 yrs62.5
Greenfield (KELLY - BUNKER HILL)GreenfieldWIMarathon County115 kV100 MW1.4 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen