TAP151842

Substation

West Virginia · MONONGAHELA POWER CO

Max voltage
138
kV

TAP151842 is an electric transmission substation in West Virginia, operated by MONONGAHELA POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorMONONGAHELA POWER CO
Coordinates38.9347, -80.0206

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#719138 kVMONONGAHELA POWER COIN SERVICE0.2 mi
#43154138 kVMONONGAHELA POWER COIN SERVICE10.1 mi
#50400138 kVMONONGAHELA POWER COIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151842, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151842 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (HARRISON - BELMONT)GreenfieldWVHarrison County500 kV1,000 MW3.2 yrs71.8
UNKNOWN108794Substation-AdjacentWVHarrison County138 kV100 MW3.0 yrs69.7
UNKNOWN108793Substation-AdjacentWVHarrison County138 kV100 MW3.0 yrs69.1
UNKNOWN108753Substation-AdjacentWVHarrison County138 kV100 MW3.0 yrs69.0
UNKNOWN108797Substation-AdjacentWVBarbour County138 kV100 MW3.0 yrs67.2
UNKNOWN108754Substation-AdjacentWVHarrison County138 kV100 MW3.0 yrs66.7
UNKNOWN108837Substation-AdjacentWVUpshur County138 kV100 MW3.0 yrs66.7
UNKNOWN132543Substation-AdjacentWVHarrison County138 kV100 MW3.0 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.