TAP139261
SubstationWest Virginia · THE POTOMAC EDISON COMPANY
TAP139261 is an electric transmission substation in West Virginia, operated by THE POTOMAC EDISON COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #35790 | 138 kV | THE POTOMAC EDISON COMPANY | IN SERVICE | 18.2 mi |
| #48321 | 138 kV | THE POTOMAC EDISON COMPANY | IN SERVICE | 0.0 mi |
| #51678 | 138 kV | THE POTOMAC EDISON COMPANY | IN SERVICE | 9.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP139261, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (MOUNT STORM - PRUNTYTOWN) | Greenfield | WV | Preston County | 500 kV | 1,000 MW | 3.0 yrs | 69.1 |
| UNKNOWN122607 | Substation-Adjacent | MD | Garrett County | 138 kV | 100 MW | 3.0 yrs | 68.2 |
| Greenfield (HATFIELD - BLACK OAK) | Greenfield | MD | Garrett County | 500 kV | 1,000 MW | 3.0 yrs | 67.3 |
| Greenfield (HATFIELD - BLACK OAK) | Greenfield | MD | Garrett County | 500 kV | 1,000 MW | 3.0 yrs | 67.2 |
| Greenfield (HATFIELD - BLACK OAK) | Greenfield | MD | Garrett County | 500 kV | 1,000 MW | 3.0 yrs | 67.0 |
| Greenfield (HATFIELD - BLACK OAK) | Greenfield | PA | Fayette County | 500 kV | 1,000 MW | 3.0 yrs | 66.9 |
| NECESSITY | Substation-Adjacent | PA | Fayette County | 138 kV | 100 MW | 3.0 yrs | 66.6 |
| UNKNOWN122608 | Substation-Adjacent | MD | Garrett County | 138 kV | 100 MW | 3.0 yrs | 66.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP139261 substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.