TAP137203 is an electric transmission substation in West Virginia, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates38.2370, -81.8435

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2609138 kVAPPALACHIAN POWER COIN SERVICE9.4 mi
#19500138 kVAPPALACHIAN POWER COIN SERVICE2.2 mi
#26847138 kVAPPALACHIAN POWER COIN SERVICE10.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP137203, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP137203 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JOHN AMOSSubstation-AdjacentWVPutnam County765 kV1,000 MW3.2 yrs77.8
WYOMINGSubstation-AdjacentWVCabell County765 kV1,000 MW3.2 yrs75.9
AMOSSubstation-AdjacentWVPutnam County345 kV600 MW3.2 yrs71.3
CULLODENSubstation-AdjacentWVLincoln County765 kV1,000 MW3.2 yrs71.0
UNKNOWN132501Substation-AdjacentWVPutnam County138 kV100 MW3.0 yrs70.6
Greenfield (JOHN AMOS - MOUNTAINTEER)GreenfieldWVPutnam County765 kV1,000 MW3.2 yrs70.4
TAP154003Substation-AdjacentWVKanawha County138 kV100 MW3.0 yrs70.2
TURNERSubstation-AdjacentWVPutnam County138 kV100 MW3.2 yrs70.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP137203 substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.