RONCEVERTE
SubstationWest Virginia · MONONGAHELA POWER CO
RONCEVERTE is an electric transmission substation in West Virginia, operated by MONONGAHELA POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #4307 | 138 kV | — | IN SERVICE | 28.5 mi |
| #27895 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 21.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RONCEVERTE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP152833 | Substation-Adjacent | WV | Raleigh County | 138 kV | 100 MW | 3.0 yrs | 65.2 |
| UNKNOWN121136 | Substation-Adjacent | VA | Giles County | 138 kV | 100 MW | 3.0 yrs | 65.0 |
| PETERS MOUNTAIN | Substation-Adjacent | VA | Giles County | 138 kV | 100 MW | 3.0 yrs | 63.7 |
| UNKNOWN131030 | Substation-Adjacent | WV | Raleigh County | 138 kV | 100 MW | 3.0 yrs | 63.2 |
| TAP152832 | Substation-Adjacent | WV | Mercer County | 138 kV | 100 MW | 3.0 yrs | 63.2 |
| Greenfield (MATT FUNK - KANAWHA RIVER) | Greenfield | WV | Mercer County | 345 kV | 600 MW | 3.0 yrs | 63.1 |
| Greenfield (MATT FUNK - KANAWHA RIVER) | Greenfield | VA | Montgomery County | 345 kV | 600 MW | 3.0 yrs | 62.8 |
| Greenfield (MATT FUNK - KANAWHA RIVER) | Greenfield | WV | Summers County | 345 kV | 600 MW | 3.0 yrs | 62.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for RONCEVERTE substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.