HIGHLAND WIND PROJECT (PA)
SubstationWest Virginia · PENNSYLVANIA ELECTRIC CO
HIGHLAND WIND PROJECT (PA) is an electric transmission substation in West Virginia, operated by PENNSYLVANIA ELECTRIC CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1739 | 115 kV | PENNSYLVANIA ELECTRIC CO | IN SERVICE | 3.5 mi |
| #37739 | 115 kV | PENNSYLVANIA ELECTRIC CO | IN SERVICE | 13.2 mi |
| #39632 | 115 kV | PENNSYLVANIA ELECTRIC CO | — | 1.0 mi |
| #43813 | 115 kV | PENNSYLVANIA ELECTRIC CO | — | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of HIGHLAND WIND PROJECT (PA), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| JUNIATA | Substation-Adjacent | PA | Blair County | 500 kV | 1,000 MW | 3.0 yrs | 73.2 |
| CONEMAUGH | Substation-Adjacent | PA | Cambria County | 500 kV | 1,000 MW | 3.0 yrs | 71.6 |
| Greenfield (KEYSTONE - JUNIATA) | Greenfield | PA | Blair County | 500 kV | 1,000 MW | 3.0 yrs | 69.5 |
| Greenfield (UNKNOWN123462 - CONEMAUGH) | Greenfield | PA | Cambria County | 500 kV | 1,000 MW | 3.0 yrs | 68.8 |
| NORTH ALLEGHENY WINDPOWER PROJECT | Substation-Adjacent | PA | Blair County | 230 kV | 300 MW | 3.0 yrs | 68.8 |
| Greenfield (CONEMAUGH - JUNIATA) | Greenfield | PA | Cambria County | 500 kV | 1,000 MW | 3.0 yrs | 68.5 |
| SEWARD | Substation-Adjacent | PA | Indiana County | 230 kV | 300 MW | 3.0 yrs | 68.4 |
| Greenfield (CONEMAUGH - JUNIATA) | Greenfield | PA | Blair County | 500 kV | 1,000 MW | 3.0 yrs | 68.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HIGHLAND WIND PROJECT (PA) substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.