HATFIELDS FERRY POWER STATION

Substation

West Virginia · WEST PENN POWER COMPANY

Max voltage
138
kV

HATFIELDS FERRY POWER STATION is an electric transmission substation in West Virginia, operated by WEST PENN POWER COMPANY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorWEST PENN POWER COMPANY
Coordinates39.8506, -79.9080

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#49387138 kVWEST PENN POWER COMPANYIN SERVICE3.2 mi
#64147138 kVWEST PENN POWER COMPANY0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HATFIELDS FERRY POWER STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HATFIELDS FERRY POWER STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN171935Substation-AdjacentPAFayette County500 kV1,000 MW3.0 yrs76.8
YUKONSubstation-AdjacentPAWestmoreland County500 kV1,000 MW3.0 yrs76.1
FORT MARTINSubstation-AdjacentWVMonongalia County500 kV1,000 MW3.0 yrs73.4
UNKNOWN123487Substation-AdjacentWVPreston County500 kV1,000 MW3.0 yrs72.9
RONCOSubstation-AdjacentPAFayette County500 kV1,000 MW3.0 yrs72.9
UNKNOWN123481Substation-AdjacentWVMonongalia County500 kV1,000 MW3.0 yrs72.6
UNKNOWN123806Substation-AdjacentPAAllegheny County138 kV100 MW3.0 yrs71.2
Greenfield (UNKNOWN123487 - HARRISON)GreenfieldWVMonongalia County500 kV1,000 MW3.0 yrs70.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen