FRONT ROYAL

Substation

West Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
500
kV

FRONT ROYAL is an electric transmission substation in West Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates38.9685, -78.1775

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#25815500 kVVIRGINIA ELECTRIC & POWER CO0.1 mi
#49205500 kVVIRGINIA ELECTRIC & POWER COIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FRONT ROYAL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FRONT ROYAL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOSBYSubstation-AdjacentVAWinchester city500 kV1,000 MW3.0 yrs78.7
FRONT ROYALSubstation-AdjacentVAWarren County500 kV1,000 MW3.0 yrs78.2
UNKNOWN121555Substation-AdjacentVAWarren County500 kV1,000 MW3.0 yrs75.9
MORRISVILLESubstation-AdjacentVAFauquier County500 kV1,000 MW3.0 yrs75.7
NEW CREEK WINDSubstation-AdjacentVAFrederick County500 kV1,000 MW3.0 yrs73.2
DOUBSSubstation-AdjacentWVHampshire County500 kV1,000 MW3.0 yrs72.8
Greenfield (UNKNOWN121555 - MORRISVILLE)GreenfieldVAFauquier County500 kV1,000 MW3.0 yrs70.5
MEADOW BROOKSubstation-AdjacentVAFrederick County500 kV1,000 MW3.0 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FRONT ROYAL substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.