FAIRFIELD

Substation

West Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
115
kV

FAIRFIELD is an electric transmission substation in West Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates37.8705, -79.3067

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#41613115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE5.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FAIRFIELD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FAIRFIELD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEXINGTONSubstation-AdjacentVARockbridge County500 kV1,000 MW3.0 yrs75.9
Greenfield (LEXINGTON - CLOVERDALE EAST)GreenfieldVARockbridge County500 kV1,000 MW3.0 yrs70.4
Greenfield (DOOMS - VALLEY)GreenfieldVAWaynesboro city500 kV1,000 MW3.0 yrs70.0
WEST STAUNTONSubstation-AdjacentVAStaunton city230 kV300 MW3.0 yrs69.5
Greenfield (DOOMS - LEXINGTON)GreenfieldVAAugusta County500 kV1,000 MW3.0 yrs69.3
RIVERVILLESubstation-AdjacentVAAppomattox County138 kV100 MW3.0 yrs68.2
TAP138723Substation-AdjacentVARockbridge County115 kV100 MW3.0 yrs68.1
Greenfield (DOOMS - LEXINGTON)GreenfieldVARockbridge County500 kV1,000 MW3.0 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FAIRFIELD substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.