ELECTRIC AVENUE FACILITY
SubstationWest Virginia · VIRGINIA ELECTRIC & POWER CO
ELECTRIC AVENUE FACILITY is an electric transmission substation in West Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #14512 | 115 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ELECTRIC AVENUE FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN121555 | Substation-Adjacent | VA | Warren County | 500 kV | 1,000 MW | 3.0 yrs | 75.9 |
| MORRISVILLE | Substation-Adjacent | VA | Fauquier County | 500 kV | 1,000 MW | 3.0 yrs | 75.7 |
| MARSH RUN CT | Substation-Adjacent | VA | Culpeper County | 230 kV | 300 MW | 3.0 yrs | 74.9 |
| REMINGTON | Substation-Adjacent | VA | Culpeper County | 230 kV | 300 MW | 3.0 yrs | 73.4 |
| WHEELER | Substation-Adjacent | VA | Fauquier County | 230 kV | 300 MW | 3.1 yrs | 73.2 |
| WARRENTON | Substation-Adjacent | VA | Fauquier County | 230 kV | 300 MW | 3.0 yrs | 72.5 |
| Marsh Run Generation Facility | Brownfield | VA | Fauquier | — | 196 MW | — | 72.4 |
| Greenfield (MOSBY - MEADOW BROOK) | Greenfield | VA | Prince William County | 500 kV | 1,000 MW | 3.0 yrs | 72.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ELECTRIC AVENUE FACILITY substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.