DOUBLE TOLL GATE is an electric transmission substation in West Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #204 | 138 kV | — | IN SERVICE | 7.5 mi |
| #27006 | 138 kV | — | IN SERVICE | 7.6 mi |
| #30051 | 138 kV | — | IN SERVICE | 7.9 mi |
| #38511 | 138 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 7.1 mi |
| #46788 | 138 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 9.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DOUBLE TOLL GATE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MOSBY | Substation-Adjacent | VA | Winchester city | 500 kV | 1,000 MW | 3.0 yrs | 78.7 |
| FRONT ROYAL | Substation-Adjacent | VA | Warren County | 500 kV | 1,000 MW | 3.0 yrs | 78.2 |
| UNKNOWN121555 | Substation-Adjacent | VA | Warren County | 500 kV | 1,000 MW | 3.0 yrs | 75.9 |
| NEW CREEK WIND | Substation-Adjacent | VA | Frederick County | 500 kV | 1,000 MW | 3.0 yrs | 73.2 |
| WARRENTON | Substation-Adjacent | VA | Fauquier County | 230 kV | 300 MW | 3.0 yrs | 72.5 |
| MIDDLEBURG | Substation-Adjacent | VA | Loudoun County | 115 kV | 100 MW | 3.0 yrs | 70.6 |
| MEADOW BROOK | Substation-Adjacent | VA | Frederick County | 500 kV | 1,000 MW | 3.0 yrs | 70.2 |
| UNKNOWN121557 | Substation-Adjacent | VA | Winchester city | 138 kV | 100 MW | 3.0 yrs | 70.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.