CHERRY CREEK

Substation

West Virginia · APPALACHIAN POWER CO

Max voltage
138
kV

CHERRY CREEK is an electric transmission substation in West Virginia, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates37.7005, -81.1018

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#26289138 kVAPPALACHIAN POWER COIN SERVICE7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CHERRY CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CHERRY CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHERRY CREEKSubstation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs66.2
UNKNOWN108915Substation-AdjacentWVMcDowell County138 kV100 MW3.0 yrs66.1
TAP155305Substation-AdjacentWVMcDowell County138 kV100 MW3.0 yrs65.4
TAP155936Substation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs65.2
TAP152833Substation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs65.2
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldWVMcDowell County765 kV1,000 MW3.0 yrs65.2
UNKNOWN121136Substation-AdjacentVAGiles County138 kV100 MW3.0 yrs65.0
UNKNOWN131031Substation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.