CELANESE

Substation

West Virginia · APPALACHIAN POWER CO

Max voltage
138
kV

CELANESE is an electric transmission substation in West Virginia, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates37.3594, -80.7832

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51544138 kVAPPALACHIAN POWER COIN SERVICE3.5 mi
#51545138 kVAPPALACHIAN POWER CO2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CELANESE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CELANESE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CLOVERDALE 765KV - JACKSONS FE)GreenfieldVAFloyd County765 kV1,000 MW3.0 yrs69.8
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0
CHERRY CREEKSubstation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs66.2
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVAPulaski County765 kV1,000 MW3.0 yrs65.7
UNKNOWN121136Substation-AdjacentVAGiles County138 kV100 MW3.0 yrs65.0
VICKERSubstation-AdjacentVAMontgomery County138 kV100 MW3.1 yrs65.0
EAST RIVER MOUNTAINSubstation-AdjacentWVMercer County138 kV100 MW3.0 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CELANESE substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.