TAP148232

Substation

Virginia

Max voltage
115
kV

TAP148232 is an electric transmission substation in Virginia. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates37.0939, -77.4627

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8220115 kVIN SERVICE14.5 mi
#13465115 kVIN SERVICE1.2 mi
#41946115 kVIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148232, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148232 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDLOTHIANSubstation-AdjacentVAChesterfield County500 kV1,000 MW3.1 yrs78.8
SPRUANCE NUGSubstation-AdjacentVARichmond city230 kV300 MW3.1 yrs77.1
Greenfield (ELMONT - CHICKAHOMINY)GreenfieldVAHenrico County500 kV1,000 MW3.1 yrs75.3
CHESTERFIELDSubstation-AdjacentVAHenrico County230 kV300 MW3.1 yrs75.0
IRON BRIDGESubstation-AdjacentVARichmond city230 kV300 MW3.1 yrs74.4
TURNER ROADSubstation-AdjacentVAHenrico County230 kV300 MW3.1 yrs74.4
ELKOSubstation-AdjacentVAHenrico County230 kV300 MW3.1 yrs73.4
DARBYTOWN CTSSubstation-AdjacentVAHenrico County230 kV300 MW3.1 yrs72.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen