TAP147958

Substation

Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
115
kV

TAP147958 is an electric transmission substation in Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates37.3881, -76.8490

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14577115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE0.9 mi
#14579115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE6.2 mi
#27423115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147958, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147958 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (ELMONT - CHICKAHOMINY)GreenfieldVAHenrico County500 kV1,000 MW3.1 yrs75.3
SEPTASubstation-AdjacentVASurry County500 kV1,000 MW3.1 yrs73.9
ELKOSubstation-AdjacentVAHenrico County230 kV300 MW3.1 yrs73.4
WARWICKSubstation-AdjacentVANewport News city230 kV300 MW3.1 yrs73.3
CHICKAHOMINYSubstation-AdjacentVACharles City County500 kV1,000 MW3.1 yrs72.4
FORT EUSTISSubstation-AdjacentVANewport News city230 kV300 MW3.1 yrs72.0
UNKNOWN167406Substation-AdjacentVANewport News city230 kV300 MW3.1 yrs71.9
Greenfield (ELMONT - CHICKAHOMINY)GreenfieldVAHenrico County500 kV1,000 MW3.1 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147958 substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.