TAP147952

Substation

Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
230
kV

TAP147952 is an electric transmission substation in Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates37.1873, -76.5462

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28874230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE1.7 mi
#30408230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE4.6 mi
#51619230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE6.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147952, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147952 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
INDUSTRIAL PARKSubstation-AdjacentVANorfolk city230 kV300 MW3.1 yrs75.4
REEVES AVESubstation-AdjacentVAPortsmouth city230 kV300 MW3.1 yrs75.2
TAP161768Substation-AdjacentVAPortsmouth city230 kV300 MW3.1 yrs74.8
UNKNOWN115497Substation-AdjacentVAPortsmouth city230 kV300 MW3.1 yrs74.6
SEPTASubstation-AdjacentVASurry County500 kV1,000 MW3.1 yrs73.9
UNKNOWN115111Substation-AdjacentVAPortsmouth city230 kV300 MW3.1 yrs73.9
NEWPORT NEWSSubstation-AdjacentVANewport News city230 kV300 MW3.1 yrs73.4
TAP147951Substation-AdjacentVANewport News city230 kV300 MW3.1 yrs73.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147952 substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.