TAP139322

Substation

Virginia · THE POTOMAC EDISON COMPANY

Max voltage
500
kV

TAP139322 is an electric transmission substation in Virginia, operated by THE POTOMAC EDISON COMPANY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorTHE POTOMAC EDISON COMPANY
Coordinates39.2992, -77.1711

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2147500 kVIN SERVICE48.1 mi
#5810500 kVTHE POTOMAC EDISON COMPANYIN SERVICE0.0 mi
#26585500 kVIN SERVICE18.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139322, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139322 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GOOSE CREEKSubstation-AdjacentVALoudoun County500 kV1,000 MW3.1 yrs79.7
BRAMBLETONSubstation-AdjacentVALoudoun County500 kV1,000 MW3.1 yrs79.1
WALNEYSubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs76.8
UNKNOWN162231Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs76.6
RESTONSubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs75.9
SANDY SPRINGSubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs75.8
TAP139321Substation-AdjacentMDMontgomery County500 kV1,000 MW3.1 yrs75.6
DRANESVILLESubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs75.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139322 substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.