TAP139156

Substation

Virginia · BALTIMORE GAS & ELECTRIC CO

Max voltage
115
kV

TAP139156 is an electric transmission substation in Virginia, operated by BALTIMORE GAS & ELECTRIC CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBALTIMORE GAS & ELECTRIC CO
Coordinates39.1632, -76.5683

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#563115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE2.3 mi
#6344115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE6.4 mi
#38161115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139156, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139156 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAUGH CHAPELSubstation-AdjacentMDAnne Arundel County500 kV1,000 MW3.1 yrs77.7
CONASTONESubstation-AdjacentMDBaltimore County500 kV1,000 MW3.1 yrs77.1
SANDY SPRINGSubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs75.8
HIGH RIDGESubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs74.7
TOKOMASubstation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs74.7
TAP161305Substation-AdjacentMDHarford County230 kV300 MW3.1 yrs74.5
BENNING (230KV)Substation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs74.5
JERICHOSubstation-AdjacentMDAnne Arundel County230 kV300 MW3.1 yrs74.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139156 substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.