TAP139153

Substation

Virginia · BALTIMORE GAS & ELECTRIC CO

Max voltage
115
kV

TAP139153 is an electric transmission substation in Virginia, operated by BALTIMORE GAS & ELECTRIC CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBALTIMORE GAS & ELECTRIC CO
Coordinates39.2377, -76.7381

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10688115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE0.1 mi
#10689115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE4.6 mi
#29662115 kVBALTIMORE GAS & ELECTRIC COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139153, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139153 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAUGH CHAPELSubstation-AdjacentMDAnne Arundel County500 kV1,000 MW3.1 yrs77.7
CONASTONESubstation-AdjacentMDBaltimore County500 kV1,000 MW3.1 yrs77.1
SANDY SPRINGSubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs75.8
BUZZARD POINTSubstation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs75.5
HIGH RIDGESubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs74.7
TOKOMASubstation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs74.7
BRIGHTONSubstation-AdjacentMDHoward County500 kV1,000 MW3.1 yrs74.6
BENNING (230KV)Substation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs74.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139153 substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.