POTOMAC RIVER

Substation

Virginia

Max voltage
230
kV

POTOMAC RIVER is an electric transmission substation in Virginia. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates38.8168, -77.0256

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11370230 kVIN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of POTOMAC RIVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near POTOMAC RIVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN162181Substation-AdjacentMDPrince George's County500 kV1,000 MW3.1 yrs78.3
WAUGH CHAPELSubstation-AdjacentMDAnne Arundel County500 kV1,000 MW3.1 yrs77.7
UNKNOWN162182Substation-AdjacentMDPrince George's County500 kV1,000 MW3.1 yrs77.6
OXSubstation-AdjacentVAFairfax County500 kV1,000 MW3.1 yrs77.1
WALNEYSubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs76.8
RESTONSubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs75.9
SANDY SPRINGSubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs75.8
BUZZARD POINTSubstation-AdjacentDCDistrict of Columbia230 kV300 MW3.1 yrs75.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for POTOMAC RIVER substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.