ORCHARD STATION

Substation

Virginia · ATLANTIC CITY ELECTRIC CO

Max voltage
500
kV

ORCHARD STATION is an electric transmission substation in Virginia, operated by ATLANTIC CITY ELECTRIC CO. It is classified as extra-high-voltage (500 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines1

Ownership & operation

OperatorATLANTIC CITY ELECTRIC CO
Coordinates39.5860, -75.2473

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7630500 kVATLANTIC CITY ELECTRIC COIN SERVICE19.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ORCHARD STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ORCHARD STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIBERTY ELECTRIC POWER PLANTSubstation-AdjacentPADelaware County230 kV300 MW3.0 yrs78.0
UNKNOWN171738Substation-AdjacentPADelaware County230 kV300 MW3.0 yrs75.5
PASSYUNKSubstation-AdjacentPAPhiladelphia County230 kV300 MW3.0 yrs75.4
MASTERSubstation-AdjacentPAPhiladelphia County230 kV300 MW3.0 yrs75.3
NEW FREEDOMSubstation-AdjacentNJCamden County500 kV1,000 MW3.0 yrs75.2
LINWOODSubstation-AdjacentPADelaware County230 kV300 MW3.0 yrs75.0
BEAVER BROOKSubstation-AdjacentNJCamden County230 kV300 MW3.0 yrs75.0
UNKNOWN128234Substation-AdjacentPADelaware County230 kV300 MW3.0 yrs74.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen