NORTH CLAYTOR

Substation

Virginia · APPALACHIAN POWER CO

Max voltage
138
kV

NORTH CLAYTOR is an electric transmission substation in Virginia, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates37.1233, -80.5303

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42008138 kVAPPALACHIAN POWER COIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH CLAYTOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH CLAYTOR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AXTONSubstation-AdjacentVACarroll County765 kV1,000 MW3.1 yrs72.5
MATT FUNKSubstation-AdjacentVASalem city345 kV600 MW3.0 yrs71.4
JACKSONS FERRYSubstation-AdjacentVAMontgomery County765 kV1,000 MW3.0 yrs71.1
Greenfield (CLOVERDALE 765KV - JACKSONS FE)GreenfieldVAFloyd County765 kV1,000 MW3.0 yrs69.8
JACKSONS FERRYSubstation-AdjacentVACarroll County765 kV1,000 MW3.1 yrs68.4
Greenfield (AXTON - JACKSONS FERRY)GreenfieldVAFloyd County765 kV1,000 MW3.1 yrs67.8
Greenfield (AXTON - JACKSONS FERRY)GreenfieldVAFloyd County765 kV1,000 MW3.1 yrs67.5
Greenfield (JACKSONS FERRY - BROADFORD (76)GreenfieldVAWythe County765 kV1,000 MW3.1 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.