LIME KILN

Substation

Virginia · THE POTOMAC EDISON CO

Max voltage
230
kV

LIME KILN is an electric transmission substation in Virginia, operated by THE POTOMAC EDISON CO. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorTHE POTOMAC EDISON CO
Co-ownerTHE POTOMAC EDISON COMPANY
Coordinates39.3475, -77.4608

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2330230 kVTHE POTOMAC EDISON COMPANYIN SERVICE4.9 mi
#5941230 kVTHE POTOMAC EDISON COMPANYIN SERVICE6.9 mi
#18023230 kVTHE POTOMAC EDISON COMPANYIN SERVICE6.8 mi
#18158230 kVTHE POTOMAC EDISON COMPANYIN SERVICE4.2 mi
#42645230 kVTHE POTOMAC EDISON COIN SERVICE12.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LIME KILN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LIME KILN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GOOSE CREEKSubstation-AdjacentVALoudoun County500 kV1,000 MW3.1 yrs79.7
BRAMBLETONSubstation-AdjacentVALoudoun County500 kV1,000 MW3.1 yrs79.1
UNKNOWN162231Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs76.6
TAP139321Substation-AdjacentMDMontgomery County500 kV1,000 MW3.1 yrs75.6
DRANESVILLESubstation-AdjacentVAFairfax city230 kV300 MW3.1 yrs75.5
GREENWAYSubstation-AdjacentVALoudoun County230 kV300 MW3.1 yrs75.5
ASHBURNSubstation-AdjacentVALoudoun County230 kV300 MW3.1 yrs75.1
UNKNOWN146359Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs74.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LIME KILN substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.