JACKSONS FERRY

Substation

Virginia · APPALACHIAN POWER CO

Max voltage
765
kV

JACKSONS FERRY is an electric transmission substation in Virginia, operated by APPALACHIAN POWER CO. It is classified as extra-high-voltage (765 kv+) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage765 kV
Min voltage138 kV
Voltage classExtra-high-voltage (765 kV+)
Connected lines9

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates36.8829, -80.8098

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27435765 kVAPPALACHIAN POWER COIN SERVICE73.4 mi
#48852765 kVAPPALACHIAN POWER COIN SERVICE48.9 mi
#56815500 kVIN SERVICE53.7 mi
#16397138 kVAPPALACHIAN POWER COIN SERVICE13.9 mi
#909138 kVAPPALACHIAN POWER COIN SERVICE17.8 mi
#47274138 kVAPPALACHIAN POWER COIN SERVICE9.9 mi
#16399138 kVAPPALACHIAN POWER CO0.2 mi
#957138 kVAPPALACHIAN POWER COIN SERVICE13.8 mi
#964138 kVAPPALACHIAN POWER COIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JACKSONS FERRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JACKSONS FERRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AXTONSubstation-AdjacentVACarroll County765 kV1,000 MW3.1 yrs72.5
Greenfield (CLOVERDALE 765KV - JACKSONS FE)GreenfieldVAFloyd County765 kV1,000 MW3.0 yrs69.8
WYTHESubstation-AdjacentVAWythe County138 kV100 MW3.0 yrs68.6
JACKSONS FERRYSubstation-AdjacentVACarroll County765 kV1,000 MW3.1 yrs68.4
Greenfield (AXTON - JACKSONS FERRY)GreenfieldVAFloyd County765 kV1,000 MW3.1 yrs67.5
Greenfield (JACKSONS FERRY - BROADFORD (76)GreenfieldVAWythe County765 kV1,000 MW3.1 yrs67.2
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.