CREWE

Substation

Virginia

Max voltage
115
kV

CREWE is an electric transmission substation in Virginia. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates37.1695, -78.1372

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23160115 kVIN SERVICE13.4 mi
#42533115 kVIN SERVICE12.1 mi
#50398115 kVIN SERVICE1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CREWE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CREWE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (MIDLOTHIAN - NORTH ANNA)GreenfieldVAPowhatan County500 kV1,000 MW3.0 yrs70.3
TAP147903Substation-AdjacentVAPowhatan County230 kV300 MW3.0 yrs70.2
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVAMecklenburg County500 kV1,000 MW3.1 yrs70.1
TAP147994Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs70.0
UNKNOWN116439Substation-AdjacentVACumberland County230 kV300 MW3.0 yrs69.6
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVALunenburg County500 kV1,000 MW3.1 yrs69.5
CHASE CITYSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.3
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVALunenburg County500 kV1,000 MW3.1 yrs69.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CREWE substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.