BOYKINS

Substation

Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
230
kV

BOYKINS is an electric transmission substation in Virginia, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates36.6004, -77.1937

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20457230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE6.8 mi
#48120230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE15.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BOYKINS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BOYKINS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOYKINSSubstation-AdjacentVASouthampton County230 kV300 MW3.1 yrs70.0
UNKNOWN114519Substation-AdjacentVASouthampton County230 kV300 MW3.1 yrs69.3
CLUBHOUSESubstation-AdjacentVAEmporia city230 kV300 MW3.1 yrs68.2
SOUTHAMPTON POWER STATIONSubstation-AdjacentVAFranklin city230 kV300 MW3.1 yrs67.7
UNKNOWN114521Substation-AdjacentVAFranklin city230 kV300 MW3.1 yrs67.4
Greenfield (SUFFOLK - CARSON)GreenfieldVASurry County500 kV1,000 MW3.1 yrs67.0
SAPONYSubstation-AdjacentVAEmporia city230 kV300 MW3.1 yrs66.8
TAP148239Substation-AdjacentVASouthampton County230 kV300 MW3.1 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.