TAP305271

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP305271 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.5536, -96.6383

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84231138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE4.3 mi
#86582138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE1.8 mi
#87237138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE9.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305271, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305271 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLLINSubstation-AdjacentTXCollin County345 kV600 MW3.4 yrs72.1
FARMERSVILLESubstation-AdjacentTXCollin County345 kV600 MW3.4 yrs71.6
ANNASubstation-AdjacentTXCollin County345 kV600 MW3.4 yrs70.8
UNKNOWN301314Substation-AdjacentTXFannin County345 kV600 MW3.4 yrs70.2
ROCK HILLSubstation-AdjacentTXCollin County138 kV100 MW3.4 yrs68.9
CUSTERSubstation-AdjacentTXCollin County138 kV100 MW3.4 yrs68.9
UNKNOWN309018Substation-AdjacentTXGrayson County230 kV300 MW3.4 yrs68.5
NAVOSubstation-AdjacentTXDenton County138 kV100 MW3.4 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP305271 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.