TAP302744

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

TAP302744 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates33.6342, -96.1587

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82119138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE26.5 mi
#85323138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.0 mi
#87024138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE12.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302744, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302744 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLEVELANDSubstation-AdjacentOKBryan County345 kV600 MW3.4 yrs70.4
UNKNOWN301314Substation-AdjacentTXFannin County345 kV600 MW3.4 yrs70.2
UNKNOWN302406Substation-AdjacentTXFannin County345 kV600 MW3.4 yrs68.2
JOHNSONSubstation-AdjacentTXFannin County345 kV600 MW3.4 yrs67.5
UNKNOWN303249Substation-AdjacentTXFannin County345 kV600 MW3.4 yrs67.3
UNKNOWN118773Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs67.2
UNKNOWN308775Substation-AdjacentTXCollin County138 kV100 MW3.4 yrs67.1
UNKNOWN175146Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen