TAOS

Substation

Texas · KIT CARSON ELECTRIC COOPERATIVE

Max voltage
345
kV

TAOS is an electric transmission substation in Texas, operated by KIT CARSON ELECTRIC COOPERATIVE. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorKIT CARSON ELECTRIC COOPERATIVE
StateTexas
Coordinates36.3949, -105.6336

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81365345 kVIN SERVICE37.5 mi
#84986115 kVKIT CARSON ELECTRIC COOPERATIVEIN SERVICE21.3 mi
#86637115 kVIN SERVICE39.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAOS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAOS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAOSSubstation-AdjacentNMTaos County345 kV600 MW3.4 yrs66.0
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs64.4
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs63.4
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs61.8
TAP318061Substation-AdjacentNMTaos County115 kV100 MW3.4 yrs60.2
Greenfield (OJO - TAOS)GreenfieldNMLos Alamos County345 kV600 MW3.4 yrs58.5
Greenfield (TAP318061 - None)GreenfieldNMTaos County115 kV100 MW3.4 yrs57.0
BLACK LAKESubstation-AdjacentNMTaos County115 kV100 MW3.4 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.