Taos County, New Mexico · ERCOT

DC Readiness
56.4
Good / 100

BLACK LAKE is a substation-adjacent datacenter candidate site in Taos County, New Mexico, interconnecting through ERCOT. It screens at 56.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBLACK LAKE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.15¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPSouthwest Cyberport Albuquerque
IXP distance115.6 mi
Fiber providers3
Fiber coverage87.5%
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance435.1 mi

Site characteristics

Parcel ownerKIT CARSON ELECTRIC COOPERATIVE
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone D
Water stress (WRI)4.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteANGEL FIRE COLLISION TOWING SERVICE INC
Hazard sub-score75/100
Construction cost index71.4 (avg 100)

Location context

Nearest datacenterJohn F. Simms Building
DC distance62.7 mi
Nearest rail3.5 mi
Nearest gas pipeline1.7 mi
Nearest fiber route35.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.40¢/kWh
Industrial electricity11.22¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$2,095

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
56
Fiber connectivity12%
28
Energy cost10%
93
Water risk8%
48
Natural hazard8%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
91
Gas pipeline2%
95
Tax incentive2%
0
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Taos County, ranked by DC Readiness.

Sites near BLACK LAKE
SiteTypeVoltageCapacityQueue waitScore
TAOSSubstation-Adjacent345 kV600 MW3.4 yrs66.0
Greenfield (OJO - TAOS)Greenfield345 kV600 MW3.4 yrs64.4
Greenfield (OJO - TAOS)Greenfield345 kV600 MW3.4 yrs63.4
Greenfield (OJO - TAOS)Greenfield345 kV600 MW3.4 yrs61.8
TAP318061Substation-Adjacent115 kV100 MW3.4 yrs60.2
Greenfield (TAP318061 - None)Greenfield115 kV100 MW3.4 yrs57.0
Greenfield (BLACK LAKE - TAOS)Greenfield115 kV100 MW3.4 yrs52.2
Greenfield (BLACK LAKE - TAOS)Greenfield115 kV100 MW3.4 yrs51.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLACK LAKE, Taos County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.