BLACK LAKE

Substation

Texas · KIT CARSON ELECTRIC COOPERATIVE

Max voltage
115
kV

BLACK LAKE is an electric transmission substation in Texas, operated by KIT CARSON ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorKIT CARSON ELECTRIC COOPERATIVE
StateTexas
Coordinates36.3994, -105.2856

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84808115 kVIN SERVICE39.5 mi
#84986115 kVKIT CARSON ELECTRIC COOPERATIVEIN SERVICE21.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BLACK LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BLACK LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAOSSubstation-AdjacentNMTaos County345 kV600 MW3.4 yrs66.0
RAINSVILLE TAPSubstation-AdjacentNMMora County115 kV100 MW3.4 yrs57.7
UNKNOWN306518Substation-AdjacentNMColfax County115 kV100 MW3.4 yrs57.2
BLACK LAKESubstation-AdjacentNMTaos County115 kV100 MW3.4 yrs56.4
Greenfield (SPRINGER - None)GreenfieldNMMora County115 kV100 MW3.4 yrs55.8
Greenfield (SPRINGER - BLACK LAKE)GreenfieldNMColfax County115 kV100 MW3.4 yrs55.4
Greenfield (BLACK LAKE - TAOS)GreenfieldNMTaos County115 kV100 MW3.4 yrs52.2
Greenfield (SPRINGER - None)GreenfieldNMMora County115 kV100 MW3.4 yrs52.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLACK LAKE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.