BEAVER

Substation

Texas · ENTERGY ARKANSAS INC

Max voltage
161
kV

BEAVER is an electric transmission substation in Texas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorENTERGY ARKANSAS INC
Co-ownerSOUTHWESTERN POWER ADMINISTRATION
StateTexas
Coordinates36.4436, -93.9211

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23285161 kVSOUTHWESTERN POWER ADMINISTRATIONIN SERVICE7.3 mi
#42374161 kVENTERGY ARKANSAS INCIN SERVICE11.0 mi
#46015161 kVSOUTHWESTERN POWER ADMINISTRATIONIN SERVICE11.1 mi
#64278161 kVENTERGY ARKANSAS INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEAVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEAVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Genova Arkansas I LLCBrownfieldARBenton County345 kV631 MW1.4 yrs73.2
TONTITOWNSubstation-AdjacentARBenton County345 kV600 MW3.4 yrs72.7
FAYETTEVILLE SOUTHSubstation-AdjacentARWashington County161 kV100 MW3.4 yrs71.2
UNKNOWN122388Substation-AdjacentARWashington County161 kV100 MW3.4 yrs70.9
EAST FAYETTEVILLESubstation-AdjacentARWashington County161 kV100 MW3.4 yrs70.5
UNKNOWN117327Substation-AdjacentARWashington County161 kV100 MW3.4 yrs70.3
UNKNOWN117307Substation-AdjacentARWashington County161 kV100 MW3.4 yrs69.3
WESTSIDE WASTEWATER TREATMENT PLANTSubstation-AdjacentARWashington County161 kV100 MW3.4 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEAVER substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.