WESTSIDE WASTEWATER TREATMENT PLANT

Substation-Adjacent

Washington County, Arkansas · ERCOT

DC Readiness
68.4
Good / 100

WESTSIDE WASTEWATER TREATMENT PLANT is a substation-adjacent datacenter candidate site in Washington County, Arkansas, interconnecting through ERCOT. It screens at 68.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWESTSIDE WASTEWATER TREATMENT PLANT
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance3.5 mi
Fiber providers10
Fiber coverage93.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance271.2 mi

Site characteristics

Parcel ownerSOUTHWESTERN ELECTRIC POWER CO
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteLEVI STRAUSS AND COMPANY
Hazard sub-score37/100
Construction cost index86.8 (avg 100)

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance3.5 mi
Nearest rail0.8 mi
Nearest gas pipeline1.7 mi
Nearest fiber route73.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.88¢/kWh
Industrial electricity7.78¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$7,460

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
55
Fiber connectivity12%
97
Energy cost10%
93
Water risk8%
84
Natural hazard8%
37
Buildability7%
90
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
78
Gas pipeline2%
95
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near WESTSIDE WASTEWATER TREATMENT PLANT
SiteTypeVoltageCapacityQueue waitScore
FAYETTEVILLE SOUTHSubstation-Adjacent161 kV100 MW3.4 yrs71.2
UNKNOWN122388Substation-Adjacent161 kV100 MW3.4 yrs70.9
EAST FAYETTEVILLESubstation-Adjacent161 kV100 MW3.4 yrs70.5
UNKNOWN117327Substation-Adjacent161 kV100 MW3.4 yrs70.3
UNKNOWN117307Substation-Adjacent161 kV100 MW3.4 yrs69.3
UNKNOWN107853Substation-Adjacent161 kV100 MW3.4 yrs67.2
Greenfield (TONTITOWN - CHAMBERS SPRINGS)Greenfield345 kV600 MW3.4 yrs65.7
Greenfield (SILOAM SPRINGS - CHAMBERS SPRI)Greenfield161 kV100 MW3.4 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WESTSIDE WASTEWATER TREATMENT PLANT, Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.