TAP170296

Substation

Tennessee

Max voltage
161
kV

TAP170296 is an electric transmission substation in Tennessee. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.6114, -86.6978

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#58592161 kVIN SERVICE7.1 mi
#58593161 kVIN SERVICE0.0 mi
#58594161 kVIN SERVICE10.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP170296, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP170296 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RUTHERFORDSubstation-AdjacentTNWilliamson County500 kV1,000 MW3.7 yrs76.5
MAURYSubstation-AdjacentTNMaury County500 kV1,000 MW3.7 yrs76.4
Greenfield (PIN HOOK - DAVIDSON)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs75.9
Greenfield (RUTHERFORD - MAURY)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs74.3
EAST COOL SPRINGSSubstation-AdjacentTNWilliamson County161 kV100 MW3.7 yrs74.2
TAP153487Substation-AdjacentTNWilliamson County161 kV100 MW3.7 yrs74.1
TAP155166Substation-AdjacentTNWilliamson County161 kV100 MW3.7 yrs74.0
Greenfield (PIN HOOK - DAVIDSON)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs73.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP170296 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.