TAP167435

Substation

South Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP167435 is an electric transmission substation in South Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates33.6773, -80.1663

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51764115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE2.3 mi
#51765115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.0 mi
#53371115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE8.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167435, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167435 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP142288Substation-AdjacentSCClarendon County230 kV300 MW3.7 yrs70.7
UNKNOWN120919Substation-AdjacentSCClarendon County230 kV300 MW3.7 yrs70.7
UNKNOWN151891Substation-AdjacentSCClarendon County115 kV100 MW3.7 yrs69.4
UNKNOWN147145Substation-AdjacentSCWilliamsburg County115 kV100 MW3.7 yrs68.3
UNKNOWN150544Substation-AdjacentSCClarendon County115 kV100 MW3.7 yrs67.8
UNKNOWN117353Substation-AdjacentSCBerkeley County230 kV300 MW4.3 yrs67.5
TAP146686Substation-AdjacentSCWilliamsburg County115 kV100 MW3.7 yrs67.2
UNKNOWN121175Substation-AdjacentSCBerkeley County115 kV100 MW3.7 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.