TAP155818

Substation

South Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP155818 is an electric transmission substation in South Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates32.2159, -82.3841

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8925115 kVGEORGIA POWER COIN SERVICE2.1 mi
#9117115 kVGEORGIA POWER COIN SERVICE2.9 mi
#9799115 kVGEORGIA POWER COIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155818, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155818 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EDWIN I HATCHSubstation-AdjacentGAToombs County500 kV1,000 MW5.8 yrs76.9
Greenfield (UNKNOWN111864 - BONAIRE)GreenfieldGAToombs County500 kV1,000 MW3.7 yrs69.7
UNKNOWN112030Substation-AdjacentGAToombs County230 kV300 MW3.7 yrs69.5
Greenfield (UNKNOWN111864 - BONAIRE)GreenfieldGAWheeler County500 kV1,000 MW3.7 yrs69.4
Greenfield (UNKNOWN111864 - BONAIRE)GreenfieldGAMontgomery County500 kV1,000 MW3.7 yrs69.3
Greenfield (UNKNOWN111864 - BONAIRE)GreenfieldGAWheeler County500 kV1,000 MW3.7 yrs69.3
UNKNOWN112033Substation-AdjacentGAToombs County115 kV100 MW3.7 yrs68.7
UNKNOWN112031Substation-AdjacentGATreutlen County230 kV300 MW3.7 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155818 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.