TAP146885

Substation

South Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP146885 is an electric transmission substation in South Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates33.3316, -79.3510

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#52033115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.3 mi
#52034115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE2.6 mi
#52035115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP146885, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP146885 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121178Substation-AdjacentSCGeorgetown County230 kV300 MW3.7 yrs73.5
UNKNOWN146821Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs73.2
TAP146680Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs73.0
TAP146870Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs72.7
TAP146894Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs72.3
UNKNOWN146678Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs71.9
TAP146899Substation-AdjacentSCGeorgetown County115 kV100 MW3.7 yrs70.6
UNKNOWN146898Substation-AdjacentSCGeorgetown County115 kV100 MW3.7 yrs70.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146885 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.