TAP142125

Substation

South Carolina · GEORGIA POWER CO

Max voltage
230
kV

TAP142125 is an electric transmission substation in South Carolina, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates32.3303, -81.1871

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15490230 kVGEORGIA POWER COIN SERVICE0.1 mi
#21833230 kVGEORGIA POWER COIN SERVICE6.7 mi
#47158230 kVGEORGIA POWER COIN SERVICE1.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142125, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142125 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCINTOSH COMBINED CYCLE FACILITYSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs75.1
EFFINGHAM COUNTY POWER PROJECTSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs74.6
BLANDFORDSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs74.3
UNKNOWN112088Substation-AdjacentGAEffingham County230 kV300 MW3.7 yrs73.1
WEST MCINTOSHSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs72.2
DORCHESTERSubstation-AdjacentGAChatham County230 kV300 MW5.8 yrs71.5
Greenfield (WEST MCINTOSH - UNKNOWN155812)GreenfieldGAEffingham County500 kV1,000 MW3.7 yrs71.5
SANTEE COOPERSubstation-AdjacentSCBeaufort County230 kV300 MW3.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142125 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.